SRINAGAR: In a major milestone for railway connectivity, the newly constructed line spanning 14.869 kilometers within the Banihal-Khari part of Firozpur Division is ready to be inaugurated. The electrified prepare operation will start shortly, marking an important step in enhancing the area’s transportation infrastructure.
As a part of the Amrit Mahotsav celebrations, a high-speed trial of the Banihal-Khari part will probably be carried out on January 3, 2024. The Commissioner of Railway Security will oversee the inspection, guaranteeing adherence to security requirements and operational effectivity. The trial will probably be carried out by a particular prepare after an intensive trolley inspection.
Following the profitable trial, common prepare providers will start between Banihal and Khari Stations as a part of the formidable USBRL Mission. This new line is predicted to enhance connectivity and facilitate smoother transportation within the area.
The opening of the Banihal-Khari part marks a major stride in direction of modernizing railway infrastructure, aligning with India’s imaginative and prescient for sturdy and environment friendly transportation networks. The Firozpur Division seems to be ahead to the graduation of normal prepare providers, offering improved connectivity for the advantage of the local people and past.
Commissioner of Railway Security, Northern Circle, New Delhi will probably be conducting statutory inspection and pace path of prepare on Banihal-Khari block part of USBRL undertaking in Ramban district of J&Ok on 03-01-2023.
After the inspection of CRS the monitor will probably be opened for passenger Rail visitors. (KNS)
#BanihalKhari #Rail #Part #Prepared #Operations